Essec\Faculty\Model\Contribution {#2506
#_index: "academ_contributions"
#_id: "9791"
#_source: array:26 [
"id" => 9791
"slug" => "9791-who-should-have-a-say-developing-a-rationale-for-consultation-with-older-persons-in-relation-to-commissioning-plans"
"yearMonth" => "1996-01"
"year" => 1996
"title" => "Who should have a say? Developing a Rationale for Consultation with Older Persons in Relation to Commissioning Plans"
"description" => "AVISON, D., WALDMAN, J., ORME, J., FORBES, I. et GLASTONBURY, B. (1996). Who should have a say? Developing a Rationale for Consultation with Older Persons in Relation to Commissioning Plans. <i>Generations Review</i>, pp. 6-11."
"authors" => array:5 [
0 => array:3 [
"name" => "AVISON David"
"bid" => "B00000019"
"slug" => "avison-david"
]
1 => array:1 [
"name" => "WALDMAN J."
]
2 => array:1 [
"name" => "ORME J."
]
3 => array:1 [
"name" => "FORBES I."
]
4 => array:1 [
"name" => "GLASTONBURY B."
]
]
"ouvrage" => ""
"keywords" => []
"updatedAt" => "2021-07-13 14:31:20"
"publicationUrl" => null
"publicationInfo" => array:3 [
"pages" => "6-11"
"volume" => null
"number" => null
]
"type" => array:2 [
"fr" => "Articles"
"en" => "Journal articles"
]
"support_type" => array:2 [
"fr" => "Revue professionnelle"
"en" => "Professional journal"
]
"countries" => array:2 [
"fr" => null
"en" => null
]
"abstract" => array:2 [
"fr" => null
"en" => null
]
"authors_fields" => array:2 [
"fr" => "Systèmes d'Information, Data Analytics et Opérations"
"en" => "Information Systems, Data Analytics and Operations"
]
"indexedAt" => "2026-11-11T09:23:30.000Z"
"docTitle" => "Who should have a say? Developing a Rationale for Consultation with Older Persons in Relation to Commissioning Plans"
"docSurtitle" => "Journal articles"
"authorNames" => "<a href="/cv/avison-david">AVISON David</a>, WALDMAN J., ORME J., FORBES I., GLASTONBURY B."
"docDescription" => "<span class="document-property-authors">AVISON David, WALDMAN J., ORME J., FORBES I., GLASTONBURY B.</span><br><span class="document-property-authors_fields">Information Systems, Data Analytics and Operations</span> | <span class="document-property-year">1996</span>"
"keywordList" => ""
"docPreview" => "<b>Who should have a say? Developing a Rationale for Consultation with Older Persons in Relation to Commissioning Plans</b><br><span>1996-01 | Journal articles </span>"
"docType" => "research"
"publicationLink" => "<a href="#" target="_blank">Who should have a say? Developing a Rationale for Consultation with Older Persons in Relation to Commissioning Plans</a>"
]
+lang: "en"
+"_score": 9.024894
+"parent": null
}